At a ceremony on Sunday morning at Kalshi intersection next to Balur Ground in the city at 10am, Prime Minister Sheikh Hasina will officially open the 2.34km Mirpur-Kalshi flyover for vehicular traffic.
Among those expected to attend the inaugural ceremony are the LGRD and Cooperatives Minister Md Tazul Islam, the Mayor of Dhaka North City Md Atiqul Islam, the Chief of Army Staff General SM Shafiuddin Ahmed, the lawmaker for Dhaka-16, Md Elias Uddin Mollah, and the Secretary of Local Government Division Muhammad Ibrahim.
Under the Road Widening and Development from ECB Square to Mirpur and Construction of Flyover on Kalshi Circle Project, the 2335 meter long flyover has been built and a 3.70 km stretch of road from the ECB square to Kalshi has been widened.
On January 9, 2018, the project got the ECNEC’s approval.
DNCC and Bangladesh Army (24 Engineer Construction Brigade) implemented the project at a cost of around Taka 1,012 crore.
According to the project details, the flyover looks like an English alphabet ‘Y’. The previously four lane roads have been widened to six lanes in view to ease passenger commute.
The main four-lane flyover runs from ECB square towards Kalshi and Mirpur DOHS, while a two-lane ramp descends from Kalshi intersection to Kalshi Road.
According to Dhaka North City Corporation (DNCC) public relations office, the project also includes extension of a PC girder bridge, construction of two foot over-bridges, a public toilet, two police boxes, a 7.40 kilometer RCC drain and saucer drain, a 1755 meter RCC pipe drain, retaining wall, 3383 meter communication duct, 800000 linear meter sand compaction pile, separate cycle lane, and six bus bays.
The project is expected to ease travel among the areas of Mirpur, DOHS, Pallabi, Kalshi, Mahakhali, Banani, Uttara and Airport.